The CPS Board of Education recently approved Benesch, Inc. (Lincoln) to conduct a traffic study around the Columbus Middle School as part of the process for determining if the proposed Intermediate School building could be constructed near there. The study will also be shared with the City of Columbus in hopes of finding collaborative solutions to the traffic congestion around the school site during drop off and pick up times.
The study is slated to begin on August 28th with preliminary information being completed by September 15th and the final study available for public release on October 21st.
We want to remind those dropping off students to follow marked signs, crosswalks, and current instructions for drop off and pick up procedures at CMS and always use extra caution in the area for student safety.